§ 17.136.050. Development standards.  


Latest version.
  • Development standards for the planned residential district No. 3B shall be as follows:

    A.

    Minimum Lot or Building Area Requirements.

    1.

    Phase III: ten and twenty-four hundredths (10.24) acres as shown on the approved and recorded final development plan;

    2.

    Phase IV: two and two hundred forty-seven thousandths (2.247) acres as shown on the approved and recorded final development plan.

    B.

    Minimum Perimeter Setback Requirements.

    1.

    Minimum perimeter setback requirements for all structures shall be as follows:

    a.

    Phase III.

    i.

    Perimeter: forty (40) feet from west property line;

    ii.

    Harbor Pointe Drive: fifty (50) feet from property line;

    iii.

    Phase III recreation area: ten feet from property line;

    iv.

    Phase II cluster lots: thirty (30) feet from property line;

    v.

    Phase IV: thirty (30) feet from property line.

    b.

    Phase IV.

    i.

    Perimeter: one hundred (100) feet from west property line;

    ii.

    Pemberton Drive: fifty (50) feet from property line;

    iii.

    Harbor Pointe Drive: fifty (50) feet from property line;

    iv.

    Phase III: ten feet from property line.

    2.

    All other setbacks shall be as shown on the final development plan.

    C.

    Density requirements shall be as follows:

    1.

    Phase III: nine and thirty-eight hundredths (9.38) units per acre;

    2.

    Phase IV: ten thousand (10,000) square feet of building area for a neighborhood shopping center.

    D.

    Height requirements shall be as follows:

    1.

    Phase III: forty (40) feet;

    2.

    Phase IV: thirty (30) feet.

    E.

    Parking requirements shall be as follows:

    1.

    Phase III: one and one-half (1½) spaces per unit, plus twenty (20) percent for guest parking;

    2.

    Phase IV: one space per two hundred (200) square feet of floor area.

    F.

    Landscaping. Landscaping shall be in accordance with the final landscaping plan as approved by the planning commission.

    G.

    Sign requirements shall be as follows:

    1.

    Phase III: Signs shall be in accordance with Section 17.216.070;

    2.

    Phase IV: Signs, both ground and wall signage, shall be in accordance with a sign plan approved by the Salisbury planning commission.

(Ord. 1989, 2006; prior code § 150-165.58)